- 8 stalls
- 50 kW max speed
- NACS plug
- 24/7 open
797 Roosevelt Trail, Windham, ME 04062
Tesla Supercharger in Windham, ME at 797 Roosevelt Trail: 8 stalls, up to 50 kW, NACS plug. The site opened on March 30, 2023.
- Photo: vorpalblade · Mapillary · CC BY-SA 4.0
Plan your stop
Will it work with my car?
Pick your plug to see if this site suits you.
How long, and what will it cost?
Charger details
- Address
- 797 Roosevelt Trail, Windham, ME 04062
- Status
- Open
- Opened
- March 30, 2023 (4 years ago)
- Last verified
- June 18, 2026
- Facility
- Shopping center
- Coordinates
- 43.841580, -70.441819
- Access
- 24 hours daily. NACS partner enabled.
Ratings & reviews
Nearby Superchargers
- Tesla Supercharger in Falmouth, ME – 65 Gray Road
- Tesla Supercharger in Portland, ME – 1100 Brighton Ave
- Tesla Supercharger in Portland, ME – 295 Forest Avenue
- Tesla Supercharger in Scarborough, ME – 2 Cummings Road
- Tesla Supercharger in Freeport, ME – 95 Main Street
- Tesla Supercharger in Saco, ME – 532 Main Street
Frequently asked questions
How many stalls does the Windham Supercharger have?
The Windham Supercharger has 8 stalls, with charging speeds up to 50 kW, using the NACS connector.
When did the Windham Supercharger open?
It opened on March 30, 2023.
Who can charge at the Windham Supercharger?
The listing notes: 24 hours daily. NACS partner enabled. Access can differ by vehicle, so check the Tesla app before you go.
Report a problem with this Supercharger
Data last changed October 14, 2026. Charger data: © OpenStreetMap contributors (ODbL) and the U.S. Dept. of Energy AFDC. Prices, notes and driver reports: Open Charge Map contributors (CC BY 4.0). Not affiliated with or endorsed by Tesla, Inc. Always confirm availability in your car.
