- 12 stalls
- 250 kW max speed likely V3
- NACS plug
- 24/7 open
2147 Blowing Rock Road, Boone, NC 28607
Tesla Supercharger in Boone, NC at 2147 Blowing Rock Road: 12 stalls, up to 250 kW, NACS plug. The site opened on September 12, 2022.
- Photo: AmericanMapper · Mapillary · CC BY-SA 4.0
- Photo: lvl5 · Mapillary · CC BY-SA 4.0
Plan your stop
Will it work with my car?
Pick your plug to see if this site suits you.
How long, and what will it cost?
Charger details
- Address
- 2147 Blowing Rock Road, Boone, NC 28607
- Status
- Open
- Opened
- September 12, 2022 (4 years ago)
- Last verified
- June 18, 2026
- Coordinates
- 36.196102, -81.653035
- Access
- 24 hours daily. NACS partner enabled.
Ratings & reviews
Nearby Superchargers
- Tesla Supercharger in Hickory, NC – 2631 NC-127
- Tesla Supercharger in Abingdon, VA – 25016 Lee Highway
- Tesla Supercharger in Johnson City, TN – 2120 S Roan St
- Tesla Supercharger in Hickory, NC – 2191 13th Avenue Drive SE
- Tesla Supercharger in Bristol, VA – 2415 Lee Highway
- Tesla Supercharger in Bristol, VA – 1200 Euclid Avenue
All 92 Superchargers in North Carolina
Frequently asked questions
How many stalls does the Boone Supercharger have?
The Boone Supercharger has 12 stalls, with charging speeds up to 250 kW, using the NACS connector.
When did the Boone Supercharger open?
It opened on September 12, 2022.
Who can charge at the Boone Supercharger?
The listing notes: 24 hours daily. NACS partner enabled. Access can differ by vehicle, so check the Tesla app before you go.
Report a problem with this Supercharger
Data last changed October 14, 2026. Charger data: © OpenStreetMap contributors (ODbL) and the U.S. Dept. of Energy AFDC. Prices, notes and driver reports: Open Charge Map contributors (CC BY 4.0). Not affiliated with or endorsed by Tesla, Inc. Always confirm availability in your car.
