- 8 stalls
- 250 kW max speed likely V3
- NACS plug
- 24/7 open
1665 Main Street, Weaverville, CA 96093
Tesla Supercharger in Weaverville, CA at 1665 Main Street: 8 stalls, up to 250 kW, NACS plug. The site opened on February 9, 2022.
Plan your stop
Will it work with my car?
Pick your plug to see if this site suits you.
How long, and what will it cost?
Charger details
- Address
- 1665 Main Street, Weaverville, CA 96093
- Status
- Open
- Opened
- February 9, 2022 (5 years ago)
- Last verified
- June 18, 2026
- Facility
- Grocery store
- Coordinates
- 40.720585, -122.928115
- Access
- 24 hours daily. NACS partner enabled.
Ratings & reviews
Nearby Superchargers
- Tesla Supercharger in Redding, CA – 704 Auditorium Dr
- Tesla Supercharger in Redding, CA – 1900 Hilltop Dr
- Tesla Supercharger in Redding, CA – 1050 Old Alturas Rd
- Tesla Supercharger in Anderson, CA – 5025 Rhonda Rd
- Tesla Supercharger in Cottonwood, CA – 20635 Gas Point Road
- Tesla Supercharger in Mt. Shasta, CA – 111 Morgan Way
All 709 Superchargers in California
Frequently asked questions
How many stalls does the Weaverville Supercharger have?
The Weaverville Supercharger has 8 stalls, with charging speeds up to 250 kW, using the NACS connector.
When did the Weaverville Supercharger open?
It opened on February 9, 2022.
Who can charge at the Weaverville Supercharger?
The listing notes: 24 hours daily. NACS partner enabled. Access can differ by vehicle, so check the Tesla app before you go.
Report a problem with this Supercharger
Data last changed October 14, 2026. Charger data: © OpenStreetMap contributors (ODbL) and the U.S. Dept. of Energy AFDC. Prices, notes and driver reports: Open Charge Map contributors (CC BY 4.0). Not affiliated with or endorsed by Tesla, Inc. Always confirm availability in your car.
