- 8 stalls
- 250 kW max speed likely V3
- CCS, NACS plugs
- 24/7 open
675 Western Kentucky Parkway, Beaver Dam, KY 42320
Tesla Supercharger in Beaver Dam, KY at 675 Western Kentucky Parkway: 8 stalls, up to 250 kW, CCS, NACS plug. The site opened on October 19, 2021.
Plan your stop
Will it work with my car?
Pick your plug to see if this site suits you.
How long, and what will it cost?
Charger details
- Address
- 675 Western Kentucky Parkway, Beaver Dam, KY 42320
- Status
- Open
- Opened
- October 19, 2021 (5 years ago)
- Last verified
- June 18, 2026
- Facility
- Restaurant
- Coordinates
- 37.377275, -86.826077
- Access
- 24 hours daily. Open to all vehicles.
Ratings & reviews
Nearby Superchargers
- Tesla Supercharger in Bowling Green, KY – 1676 Westpark Drive
- Tesla Supercharger in Nortonville, KY – 162 Hopkinsville Rd
- Tesla Supercharger in Smiths Grove, KY – 4001 Smiths Grove- Scottsville Rd
- Tesla Supercharger in Cave City, KY – 821 Mammoth Cave St
- Tesla Supercharger in Evansville, IN – 2622 Menards Dr
- Tesla Supercharger in Elizabethtown, KY – 809 East Dixie Avenue
All 22 Superchargers in Kentucky
Frequently asked questions
How many stalls does the Beaver Dam Supercharger have?
The Beaver Dam Supercharger has 8 stalls, with charging speeds up to 250 kW, using the CCS, NACS connector.
When did the Beaver Dam Supercharger open?
It opened on October 19, 2021.
Who can charge at the Beaver Dam Supercharger?
The listing notes: 24 hours daily. Open to all vehicles. Access can differ by vehicle, so check the Tesla app before you go.
Report a problem with this Supercharger
Data last changed October 14, 2026. Charger data: © OpenStreetMap contributors (ODbL) and the U.S. Dept. of Energy AFDC. Prices, notes and driver reports: Open Charge Map contributors (CC BY 4.0). Not affiliated with or endorsed by Tesla, Inc. Always confirm availability in your car.
